Paver and Brick Patios

Segmental paving is repairable and adaptable, but only when excavation, edge restraint, base, bedding and drainage are appropriate for the site.

Reviewed 2026-07-24By Martin J. Caldermere

Segmental paving is repairable and adaptable, but only when excavation, edge restraint, base, bedding and drainage are appropriate for the site.

What to account for

Select units rated for the climate and intended use.

The base carries the load; bedding sand is not a substitute for compacted aggregate.

Strong edge restraints prevent lateral movement and joint widening.

Questions to settle before work begins

  • Will freeze-thaw, vehicle loads or de-icing salts affect the product?
  • How will cuts and borders fit the layout?
  • Is the joint material compatible with drainage and maintenance plans?

Common planning failures

  • Laying pavers over soft topsoil
  • Using thick bedding sand to correct a poor base
  • Allowing runoff to discharge toward the foundation

Compare options on the same basis

Write down the intended use, site limits, maintenance expectations and approval assumptions before comparing products or quotations. Use the same dimensions and performance requirements for every option. A useful comparison notes what supports the work, how water leaves, what must remain accessible, which components carry safety functions, and what the owner will need to inspect or renew later.

Before materials are ordered

Confirm final elevations, transitions, clearances and product availability. Review the current installation instructions for every proprietary component and check that the planned base, framing, fasteners, finishes and accessories are compatible. Record any allowance or unresolved condition in writing so it does not quietly become an expensive change after excavation or demolition begins.

Keep a project record

Save the site measurements, product names, installation manuals, approved drawings, permit and inspection records, photos of concealed work, contractor changes and warranty documents. Add photographs before surfaces or trim conceal drainage, flashing, connectors, wiring or foundations. These records make later maintenance, repairs and ownership changes much easier.

Know when to stop

Pause the project when structural framing cannot be identified, soil or drainage conditions are uncertain, utilities may be affected, a safety barrier is involved, or the planned work conflicts with product instructions. Ask the relevant building authority, engineer, licensed trade or manufacturer for project-specific direction. Restrict use immediately if an existing elevated structure moves, a guard is loose, stairs are unstable or significant decay is visible.