Grading, Drainage and Runoff

An outdoor surface must shed water without directing it into the house, a neighbour’s property, a retaining wall or an overloaded drain.

Reviewed 2026-07-24By Martin J. Caldermere

An outdoor surface must shed water without directing it into the house, a neighbour’s property, a retaining wall or an overloaded drain.

What to account for

Record existing drainage before changing elevations.

Coordinate surface slope with door thresholds, step geometry and accessible routes.

Downspouts, sump discharge and under-deck drainage need a lawful destination.

Questions to settle before work begins

  • Where does water go during a major storm?
  • Will the project increase impermeable area?
  • Could grading expose or bury foundation materials?

Common planning failures

  • Making a patio perfectly level
  • Blocking weep holes, vents or window wells
  • Sending concentrated runoff over a slope or lot line

Compare options on the same basis

Write down the intended use, site limits, maintenance expectations and approval assumptions before comparing products or quotations. Use the same dimensions and performance requirements for every option. A useful comparison notes what supports the work, how water leaves, what must remain accessible, which components carry safety functions, and what the owner will need to inspect or renew later.

Before materials are ordered

Confirm final elevations, transitions, clearances and product availability. Review the current installation instructions for every proprietary component and check that the planned base, framing, fasteners, finishes and accessories are compatible. Record any allowance or unresolved condition in writing so it does not quietly become an expensive change after excavation or demolition begins.

Keep a project record

Save the site measurements, product names, installation manuals, approved drawings, permit and inspection records, photos of concealed work, contractor changes and warranty documents. Add photographs before surfaces or trim conceal drainage, flashing, connectors, wiring or foundations. These records make later maintenance, repairs and ownership changes much easier.

Know when to stop

Pause the project when structural framing cannot be identified, soil or drainage conditions are uncertain, utilities may be affected, a safety barrier is involved, or the planned work conflicts with product instructions. Ask the relevant building authority, engineer, licensed trade or manufacturer for project-specific direction. Restrict use immediately if an existing elevated structure moves, a guard is loose, stairs are unstable or significant decay is visible.