Concrete and Paver Repairs

Repair choices depend on whether the problem is cosmetic, drainage-related, caused by base movement or still active.

Reviewed 2026-07-24By Martin J. Caldermere

Repair choices depend on whether the problem is cosmetic, drainage-related, caused by base movement or still active.

What to account for

Track cracks and settlement before choosing patching or resurfacing.

Lift and relay segmental pavers when base correction is needed.

Match repair materials to joint width, movement and exposure.

Questions to settle before work begins

  • Is water contributing to the damage?
  • Has the movement stopped?
  • Will a rigid patch bridge an active joint?

Common planning failures

  • Filling cracks without addressing runoff
  • Overlaying loose or hollow areas
  • Using de-icing products incompatible with the surface

Compare options on the same basis

Write down the intended use, site limits, maintenance expectations and approval assumptions before comparing products or quotations. Use the same dimensions and performance requirements for every option. A useful comparison notes what supports the work, how water leaves, what must remain accessible, which components carry safety functions, and what the owner will need to inspect or renew later.

Before materials are ordered

Confirm final elevations, transitions, clearances and product availability. Review the current installation instructions for every proprietary component and check that the planned base, framing, fasteners, finishes and accessories are compatible. Record any allowance or unresolved condition in writing so it does not quietly become an expensive change after excavation or demolition begins.

Keep a project record

Save the site measurements, product names, installation manuals, approved drawings, permit and inspection records, photos of concealed work, contractor changes and warranty documents. Add photographs before surfaces or trim conceal drainage, flashing, connectors, wiring or foundations. These records make later maintenance, repairs and ownership changes much easier.

Know when to stop

Pause the project when structural framing cannot be identified, soil or drainage conditions are uncertain, utilities may be affected, a safety barrier is involved, or the planned work conflicts with product instructions. Ask the relevant building authority, engineer, licensed trade or manufacturer for project-specific direction. Restrict use immediately if an existing elevated structure moves, a guard is loose, stairs are unstable or significant decay is visible.